IMG_6952

Bin Corel before repairs

Client: Body Corporate Services
Site: StKilda, Victoria
Job: Remove damaged and rotting timber for electrical and utilities boxes as well as repairs to the bin corel. Supply and install of replacement timber throughout (as required) priming and painting in requested colour.

 

 

 

 

 

 

IMG_6953

Timber replaced during repair works

IMG_6957

Meter box before repairs

Electrical Panel prior to repair works

Electrical Panel prior to repair works

IMG_0710

Meter box after repair and painting

IMG_0704

Bin Corel after repair and painting